01
Multifamily Retrofits
Unit-by-unit installation with resident notices and quick daily turnarounds.

Retrofit & Remodel
Sprinkler retrofits, alarm upgrades and tenant improvements in occupied offices, apartments, schools and clinics, phased so your building keeps running.
Overview
Retrofitting fire protection into an existing building is a different job from new construction. Ceilings are finished, tenants are working and residents are home. Success depends on planning, communication and clean work.
We survey existing conditions, plan routing that respects finishes, phase work floor by floor and keep tenants informed with notices and a single point of contact.

Notices, schedules and questions handled.
What we do
01
Unit-by-unit installation with resident notices and quick daily turnarounds.
02
Head relocations, drops and alarm device moves for new layouts.
03
Work packed into summer breaks with phased completion.
04
Infection control, ILSM coordination and after-hours work.
05
Upgrades when a building's use changes and the code requires more protection.
06
Panel replacements and device upgrades with no gap in protection.
Standards & frequency
We build these intervals into your service calendar, so tasks happen on time and records are ready when your fire marshal or insurer asks.
| Phase | Activities | Who is involved |
|---|---|---|
| Survey | Existing conditions, water supply flow test | Riserline design team |
| Design & permit | Layouts, routing, hydraulic calcs, permit | Designers, AHJ, owner |
| Notices | Tenant and resident notices, access schedule | Owner and Riserline coordinator |
| Install by phase | Floor-by-floor install, daily cleanup | Field crews |
| Test & turn over | Acceptance tests, as-builts, inspection calendar | Inspectors, AHJ |
Phasing is coordinated with your fire marshal so each completed area can be placed in service.
How it works
01
Existing conditions and water supply documented.
02
Floor-by-floor schedule with tenant notices.
03
Clean, phased installation with daily cleanup.
04
Acceptance tests, records and inspection calendar.
Questions
Have a question about your building? Call 218-262-9553 or send a request and a specialist will follow up.
Usually not. Work in each unit typically takes a short window, and residents are notified in advance of the entry date.
Often, yes, using soffits, existing ceiling spaces or chases. Where concealment isn't practical we route exposed pipe neatly and paint it if you want.
Most sprinkler and alarm changes require a permit. We prepare the drawings and handle the submittal.
It depends on building size and access. We give you a phased schedule after the survey.
Our 24/7 line connects you with an on-call coordinator who can dispatch a technician, help you plan fire watch, and document the impairment for your records.