Emergency Responder Radio
Signal strength surveys, bi-directional amplifier and distributed antenna installs, licensing coordination and annual testing so firefighters can communicate inside your building.
Overview
Concrete, steel, low-E glass and below-grade levels can block public safety radio signals. When firefighters can't talk to each other inside a building, they lose a critical tool.
Many jurisdictions now require new buildings, and some existing ones, to provide minimum radio signal strength throughout. We survey, design, install and test emergency responder radio coverage systems.

Grid testing floor by floor.
What we do
01
Grid testing to show where coverage falls short.
02
Antenna layout, donor antenna and amplifier selection.
03
Amplifiers, antennas, cabling and enclosures.
04
Trouble and failure signals reported to your fire alarm.
05
Retransmission authorization and acceptance testing.
06
Signal strength and system tests documented each year.
Standards & frequency
We build these intervals into your service calendar, so tasks happen on time and records are ready when your fire marshal or insurer asks.
| Item | Reference | Typical requirement |
|---|---|---|
| Coverage | IFC 510 / NFPA 1225 | Minimum signal strength in most of each floor; higher in critical areas |
| Survivability | IFC 510 / NFPA 1225 | Protected cabling and enclosures as required |
| Secondary power | IFC 510 / NFPA 1225 | Battery or generator backup for the required duration |
| Testing | IFC 510 / NFPA 1225 | Annual testing; acceptance test at installation |
Requirements depend on your jurisdiction's adopted code and local public safety agency.
How it works
01
Measure existing signal throughout the building.
02
Antenna and amplifier design for your structure.
03
Install, coordinate with the agency and test.
04
Annual tests and supervised monitoring.
Questions
Have a question about your building? Call 218-262-9553 or send a request and a specialist will follow up.
Your fire marshal will tell you if it is required, usually at plan review or final inspection. A signal survey shows whether existing coverage meets the standard.
Yes. A preliminary survey can be done once the building is enclosed, with a final survey before occupancy.
No. ERRCS carries public safety radio frequencies only. Cellular coverage needs a separate system.
The building owner. We provide annual testing and repairs.
Our 24/7 line connects you with an on-call coordinator who can dispatch a technician, help you plan fire watch, and document the impairment for your records.